Trades
Doors & Windows Takeoff
Door and window schedules and floor plans disagree more often than you'd expect — we reconcile both before the count goes into your bid.
Every door and window is counted from the floor plans and cross-checked against the door and window schedule for size, type, glazing and hardware set, catching the mismatches that turn into change orders after award.
How we take it off
Openings are counted directly from the floor plans first, independent of the schedule, then reconciled against the door and window schedule by mark number. Discrepancies — an opening shown on plan but missing from the schedule, or a schedule entry that doesn't appear on plan — are flagged rather than resolved by assumption. Hardware sets, glazing type and fire ratings are carried from the schedule since they drive cost as much as the unit itself.
What the second-estimator review is checking
- Door or window count taken from the schedule alone without verifying every opening actually appears on the floor plans
- Hardware set and fire-rating requirements not carried through from the schedule into the pricing list
- Glazing type (tempered, low-E, impact-rated) assumed uniform when the schedule specifies it by opening
- Rough opening sizes not checked against the actual unit sizes being priced
Typical turnaround
24–48 hours
What we quantify
- Door and window counts by mark number
- Sizes, types and glazing per the schedule
- Hardware sets and fire ratings
- Plan-to-schedule discrepancies flagged
This as a deliverable, not just a trade
A doors & windows takeoff can be delivered as raw quantities, a full priced bid, or a fast turnaround for change-order pricing — see the service types below for which fits what you need.
Other trades we cover
Concrete Takeoff
Footings, slabs, walls and columns in cubic yards, with formwork and rebar quantified.
Drywall Takeoff
Precise board, compound, screw and corner-bead measurements instead of rule-of-thumb guesses.
Framing & Lumber Takeoff
Studs, plates, joists, headers, beams and hardware counted for framing and deck packages.
Bid more. Win more.
Stop turning down invitations to bid because the takeoff will not get done in time. Send us the plans and get your numbers back in 24–72 hours.

